Skip to content
BlueAlly
Let's talk
Menu
Search BlueAlly

Where do you want to go?

Start typing to narrow the directory.

Meraki Wireless Modernizes 27 Manufacturing Sites

Standardized wireless across 27 manufacturing sites.

Client context

The work begins with the operating reality.

Client

A global chemical manufacturer serving agriculture, automotive, industrial, and other markets through a distributed warehouse footprint.

Engagement

A chemical manufacturer standardized wireless infrastructure across 27 sites to support handheld inventory workflows and central management.

The challenge

What had to change

New handheld scanning devices depended on reliable coverage for faster and more accurate picking and shipping, but existing facilities could not support the workflow consistently.

Cabling, switches, and fiber were poorly documented, and each site's materials and layout created different radio-frequency conditions. Local teams also managed wireless independently.

The BlueAlly solution

How the work came together

BlueAlly used Ekahau and facility blueprints for predictive surveys, then validated cabling, switching, fiber, access-point placement, and building conditions onsite.

Site-specific remediation plans guided standardized Meraki access-point, switching, cabling, fiber, and wireless-bridge deployment through remote Smart Hands teams.

The results

What changed

The manufacturer brought 27 locations into one Meraki management platform in less than a year and successfully enabled the scanning workflow.

Central visibility improved network control, inventory accuracy, shipping speed, and the consistency experienced by employees moving between sites.

Outcome highlights

What the client gained.

27 sites

Standardized wireless across a distributed manufacturing footprint.

Under one year

Completed survey, remediation, and deployment at scale.

Inventory accuracy

Enabled reliable handheld scanning for warehouse operations.

One management view

Replaced separate site networks with centralized control.

Related work

More outcomes in Network & Collaboration

Automation Accelerates a Federal Network Transformation

The tool saves roughly 10-17 engineering hours each month, standardized evidence, reduced manual error, and reached ROI in under a year.

Read the story

Juniper Switch Refresh Supports Municipal Services

The city improved performance, reliability, and vendor support eligibility while completing efficient cutovers with minimal service impact.

Read the story

Unified Communications Across a Federal Organization

The organization connected its Washington and nationwide offices on one resilient platform and completed the transition in 18 months.

Read the story

E-Rate Funding Powers a School Network Transformation

The district gained a unified network, clearer visibility, streamlined management, and a stronger foundation for student learning.

Read the story

Automation Accelerates a Hospital Network Implementation

Implementation time fell from 14 weeks to four weeks while costs dropped 75 percent and future troubleshooting became faster.

Read the story

A Global Manufacturer Centralizes Network Operations

The manufacturer gained centralized visibility, reduced downtime, stronger security, and more capacity for its internal team.

Read the story

Managed Services Support Entertainment Growth

The client reduced cost and equipment turnaround time while gaining repeatable processes and flexible capacity for continued growth.

Read the story

Core Network Transformation Enables Market Expansion

The provider gained scalable capacity, stronger security, lower address costs, and new services it could take to market.

Read the story

KAMO Power Modernizes a 2,700-Mile Optical Network

The utility improved scalability, reliability, deployment speed, and cost efficiency across mission-critical regional operations.

Read the story

A New Network Supports an Energy Company Separation

The network was ready for Day 1 in six months, and the full separation was completed in 18 months.

Read the story

Have a similar constraint?

We can start with the current state, the outcome, and the limits around time, risk, and budget.

Talk to an expert