Skip to content
BlueAlly
Let's talk
Menu
Search BlueAlly

Where do you want to go?

Start typing to narrow the directory.

Automation Accelerates a Hospital Network Implementation

Automation accelerated hospital network deployment.

Client context

The work begins with the operating reality.

Client

A healthcare organization converging clinical, monitoring, security, and building systems onto a modern network.

Engagement

Automation turned a highly complex hospital network implementation into a faster, more consistent, and better documented deployment.

The challenge

What had to change

The program covered 35 Cisco 9410 switches and an equal number of 9300 switches across 20 network closets, representing as many as 13,500 interfaces.

Multiple virtual routing domains, legacy CobraNet and BACNet requirements, and extended Layer 2 services made manual port assignment and documentation slow and error-prone.

The BlueAlly solution

How the work came together

BlueAlly first established detailed switch cut sheets, then created scripts that accept connectivity requests, identify open ports, update documentation, and generate device configuration.

A standardized dataset also made later port changes faster and preserved the device, rack, patch panel, and location information needed for operations.

The results

What changed

Individual connectivity requests could be processed in less than one minute with minimal administrator intervention. The broader implementation fell from 14 weeks to four weeks.

Automation reduced overall costs by 75 percent and left the network team with a documented patch plan that supports faster maintenance and troubleshooting.

Outcome highlights

What the client gained.

13,500 interfaces

Applied repeatable configuration across a large converged network.

Under one minute

Automated individual connectivity requests and documentation.

10 weeks saved

Reduced implementation from 14 weeks to four.

75% lower cost

Cut project effort while improving consistency.

Related work

More outcomes in Network & Collaboration

Automation Accelerates a Federal Network Transformation

The tool saves roughly 10-17 engineering hours each month, standardized evidence, reduced manual error, and reached ROI in under a year.

Read the story

Juniper Switch Refresh Supports Municipal Services

The city improved performance, reliability, and vendor support eligibility while completing efficient cutovers with minimal service impact.

Read the story

Unified Communications Across a Federal Organization

The organization connected its Washington and nationwide offices on one resilient platform and completed the transition in 18 months.

Read the story

E-Rate Funding Powers a School Network Transformation

The district gained a unified network, clearer visibility, streamlined management, and a stronger foundation for student learning.

Read the story

A Global Manufacturer Centralizes Network Operations

The manufacturer gained centralized visibility, reduced downtime, stronger security, and more capacity for its internal team.

Read the story

Managed Services Support Entertainment Growth

The client reduced cost and equipment turnaround time while gaining repeatable processes and flexible capacity for continued growth.

Read the story

Core Network Transformation Enables Market Expansion

The provider gained scalable capacity, stronger security, lower address costs, and new services it could take to market.

Read the story

KAMO Power Modernizes a 2,700-Mile Optical Network

The utility improved scalability, reliability, deployment speed, and cost efficiency across mission-critical regional operations.

Read the story

Meraki Wireless Modernizes 27 Manufacturing Sites

The manufacturer improved inventory accuracy, shipping speed, enterprise visibility, and operational consistency across 27 locations.

Read the story

A New Network Supports an Energy Company Separation

The network was ready for Day 1 in six months, and the full separation was completed in 18 months.

Read the story

Have a similar constraint?

We can start with the current state, the outcome, and the limits around time, risk, and budget.

Talk to an expert