Skip to content
BlueAlly
Let's talk
Menu
Search BlueAlly

Where do you want to go?

Start typing to narrow the directory.

A New Network Supports an Energy Company Separation

Independent network and critical application migration.

Client context

The work begins with the operating reality.

Client

One of the largest U.S. energy providers, powering more than 10 million homes and businesses through nuclear, hydro, wind, and solar generation.

Engagement

A major energy provider built an independent, scalable network and migrated hundreds of critical applications during a complex company separation.

The challenge

What had to change

Separation from a parent company required new core networks at colocation sites plus independent connectivity and management across a large operating footprint.

Hundreds of business and operational technology applications had to move on a compressed schedule, creating a need for added engineering capacity and disciplined coordination.

The BlueAlly solution

How the work came together

BlueAlly worked with the client's engineers to design and deploy a scalable network architecture around its business, performance, compliance, and operating requirements.

The architecture combined a VXLAN EVPN fabric, standardized networking platforms, accelerated colocation deployment, and enclave security.

Teams configured servers, switches, routers, and supporting infrastructure at colocation sites while creating training and standardized documentation for the client's operations staff.

The results

What changed

The network was ready for Day 1 transport in six months, and the full application migration met the compressed 18-month deadline, enabling the energy company to operate independently.

The new foundation improved centralized management, created room for expansion, and transferred the knowledge needed for day-to-day operations.

Outcome highlights

What the client gained.

Day 1 in six months

Network transport ready for Day 1 in six months.

18-month migration

Completed the separation and application migration on schedule.

Hundreds of applications

Moved business and operational technology workloads.

Operational handoff

Created training and standardized deployment documentation.

Related work

More outcomes in Network & Collaboration

Automation Accelerates a Federal Network Transformation

The tool saves roughly 10-17 engineering hours each month, standardized evidence, reduced manual error, and reached ROI in under a year.

Read the story

Juniper Switch Refresh Supports Municipal Services

The city improved performance, reliability, and vendor support eligibility while completing efficient cutovers with minimal service impact.

Read the story

Unified Communications Across a Federal Organization

The organization connected its Washington and nationwide offices on one resilient platform and completed the transition in 18 months.

Read the story

E-Rate Funding Powers a School Network Transformation

The district gained a unified network, clearer visibility, streamlined management, and a stronger foundation for student learning.

Read the story

Automation Accelerates a Hospital Network Implementation

Implementation time fell from 14 weeks to four weeks while costs dropped 75 percent and future troubleshooting became faster.

Read the story

A Global Manufacturer Centralizes Network Operations

The manufacturer gained centralized visibility, reduced downtime, stronger security, and more capacity for its internal team.

Read the story

Managed Services Support Entertainment Growth

The client reduced cost and equipment turnaround time while gaining repeatable processes and flexible capacity for continued growth.

Read the story

Core Network Transformation Enables Market Expansion

The provider gained scalable capacity, stronger security, lower address costs, and new services it could take to market.

Read the story

KAMO Power Modernizes a 2,700-Mile Optical Network

The utility improved scalability, reliability, deployment speed, and cost efficiency across mission-critical regional operations.

Read the story

Meraki Wireless Modernizes 27 Manufacturing Sites

The manufacturer improved inventory accuracy, shipping speed, enterprise visibility, and operational consistency across 27 locations.

Read the story

Have a similar constraint?

We can start with the current state, the outcome, and the limits around time, risk, and budget.

Talk to an expert